BHC designed the complete replacement of three 250 HP positive displacement blowers for channel and process aeration with four new 150HP turbo blowers. The design included revisions to blower supply and discharge piping, new master control system, and in basin instrumentation. Thanks to this project, the District is now able to effectively monitor and control aeration in its basins while increasing aeration capacity, equipment redundancy, and turn-down capability.