BACK TO TOP

GENERAL SEWER PLAN UPDATE

About

The City’s previous sanitary sewer model consisted of separate model files for each sewer basin, making updates and analysis cumbersome. BHC worked with the City to update the model to reflect recently installed sewer infrastructure and to combine the model into a single file simulation. Water meter billing records were used to estimate sewer flow contributions for each contributing parcel. The more efficient and accurate model was used to analyze system deficiencies; identify requirements for new developments; and develop capital improvement plan.

Features:

  • Combined model provides more efficient analysis
  • Parcel-by-parcel flow estimates enhance accuracy of model
  • Identification of developer-driven improvements reduced long-term capital costs for City

EXPLORE 
OUR PROJECTS

See how we brought some of the most complex infrastructure challenges to life.

back to all