2015 WATER SYSTEM PLAN, NORTH PERRY AVENUE WATER DISTRICT

Bremerton

Washington

About

North Perry Avenue Water District is a Group A water system in Bremerton, WA that serves nearly 8,000 connections and has over 100 miles of water lines, twelve wells, and seven reservoirs. BHC completed the District’s most recent Water System Plan in 2015 which also included a Vulnerability Assessment and Emergency Response. The 2015 Water System Plan included population projections analysis, source and storage capacity evaluation, water rights analysis, and hydraulic modeling for 6-, 10-, and 20-year projections. The plan provided a prioritized list of potential future deficiencies and addressed capital improvements to be made to the system over the 6-, 10-, and 20-year planning period to satisfy increased population and demand. Hydraulic modeling was performed using InfoWater modeling software.

Features:

  • Performed hydraulic modeling, including water age analysis
  • Prepared 6-, 10-, and 20-year CIP
  • Update to Water Use Efficiency program and goals

EXPLORE 
OUR PROJECTS

See how we brought some of the most complex infrastructure challenges to life.

back to all