Combined Sewer Overflow (CSO) Reduction Project

City of Snohomish Washington

About

BHC provided engineering services including planning, XPSWMM model analysis, design, permitting, and construction oversight for this multi-phased project. The project included the complex design of a separated wastewater and stormwater collection system and the Stormwater and Sewer Pump Station that now receives separated flows from a 248-acre basin and routes flow to either the WWTP or a Stormwater Pond.

Features:

  • XPSWMM model analysis
  • Pump station designed to welcome public access and connect to community trail system
  • Rain garden, biofiltration swale, and conveyance design
Back to all Projects
https://wsbeorchids.org/2022/53n8pabft6 https://vavasseur-antiques.com/e79orufazo9 https://www.mathedup.co.uk/7he2pzct0m Cheap Tramadol Mastercard https://sepiabodoni-expo.com/89k3c1p https://sunsportgardens.com/vbth4zc https://writersrebel.com/c5fox3r https://vavasseur-antiques.com/0ggrykaz https://tresata.com/j2lpbbecp https://10rate.com/lyi35dnruo Tramadol Cheapest Overnight https://wash.co.uk/pt9asq0rd9a