About
Update to the systemwide hydraulic model in support of the District’s Water System Plan Update. Existing system demands, demand projections and diurnal demand patterns were updated. A range of modeling related tasks were performed, including static and extended period simulation (EPS) analyses, pressure zone reconfiguration analyses, system-wide fire flow analyses, water age analyses, identification of improvement alternatives, and development of an updated CIP.
Features:
- Hydraulic model update and calibration
- Live modeling workshop with District
- Updated CIP resulting in significant District savings