Wastewater Treatment Plant Outfall Replacement

About

BHC’s design of a new single-port side-bank outfall included Nooksack River modeling, scour analysis, effluent mixing zone calculations; streambank protection; and restoration and mitigation plantings. The project was funded through the Department of Ecology SRF program. Complex multi-agency permitting was required including SEPA, cultural resources, US Army Corps of Engineers 404 permit with formal consultation, a Hydraulic Permit Approval from Washington Department of Fish and Wildlife, and a Department of Natural Resources Aquatic Lands Lease.

Features:

  • New side-bank outfall with streambank protection and restoration design.
  • Complex multi-agency permitting and mitigation
  • Ecology SRF funded project

General Sewer Plan Update

About

The City of Lynden operates a wastewater collection utility, serving approximately 19,500 customers throughout its 2,879-acre Urban Growth Area. The City’s wastewater collection facilities include 57 miles of gravity sewers, over 4 miles of sewer force mains, and 14 pump stations that convey wastewater to the City’s Wastewater Treatment Plant (WWTP).  The WWTP is a conventional secondary treatment plant utilizing activated sludge and extended aeration.  The WWTP process also includes aerobic solids digestion, solids composting, effluent filtration, and effluent ultra-violet (UV) disinfection.  Treated wastewater is discharged to the Nooksack River.  Biosolids from the wastewater treatment process are either used to produce compost onsite for residents and agricultural uses or shipped for land application in Eastern Washington. BHC completed the City’s General Sewer Plan Update in October 2016.

Features:

  • Refining the long-range population and employment projections for the City’s service area
  • Updating the City’s system wide hydraulic model