Lakota WWTP Turbo Blower Improvements, Lakehaven Water & Sewer District

Federal Way
Washington

About

BHC designed the complete replacement of three 250 HP positive displacement blowers for channel and process aeration with four new 150HP turbo blowers. The design included revisions to blower supply and discharge piping, new master control system, and in basin instrumentation. Thanks to this project, the District is now able to effectively monitor and control aeration in its basins while increasing aeration capacity, equipment redundancy, and turn-down capability.

Features:

  • Increased aeration capacity and redundancy
  • Reduced aeration energy consumption
  • Improved aeration system monitoring and control

 

Back to all Projects