Water System Planning and Engineering Design Services, North Perry Avenue, Water District

Bremerton
Washington

About

North Perry Avenue Water District is a Group A water system in Bremerton, Washington that serves nearly 9,000 connections and has over 100 miles of water lines, twelve wells, and seven reservoirs. BHC performs the District’s water system planning, engineering, hydraulic modeling, and fire flow analysis. In addition to preparing the District’s 2001, 2009, and 2016 Water System Plans, BHC has performed engineering services for pipeline replacement and extensions, reservoir rehabilitation and upgrades, wellhead iron and manganese treatment systems; bulk sodium hypochlorite systems, and emergency backup generator/automatic transfer switch upgrades.

Features:

  • Long-standing client
  • Multi-disciplinary services
  • Cost-effective engineering solutions
Back to all Projects